Electrical Testing and Rewiring
Electrical Testing Programme 2011/12
Clackmannanshire Council is required by law to carry out electrical testing on all of its properties over a 10 year cycle to ensure electrical installations are in safe working order and meet legislative requirements.
Tenants required to give access for testing have been advised of this upcoming programme.
A total of 500 houses will be checked before April 2012.
Our Electrical Testing information booklet is available to view or download from this page.
Scheduled properties
Individual properties in the following areas are due for inspection during this financial year:
| Town | Streets |
|---|---|
| Alloa | Ashley Terrace, Harris Court, Katrine Court, Lewis Court, Menteith Court, Mitchell Crescent, Mull Court, Pine Grove, Rose Street, Shetland Court, Thorne Road and Whins Road. |
| Clackmannan | Garden Place |
| Dollar | Walton Crescent |
The contractor will test the existing wiring, sockets, switches and fuse boards in accordance with the Periodic Inspection & Testing of Institution of Electrical Engineers (IEE) Wiring Regulations. This will be done with the minimum disruption to our tenants. The electrical contractor will produce identification prior to seeking access to houses.
Electrical Rewiring Contract 406300 Year 2011/12
This programme is part of Clackmannanshire Council's ongoing commitment to bringing all of its housing stock up to meet the Scottish Housing Quality Standard.
Our Electrical Rewiring information booklet is available to view or download from this page.
Scheduled Properties
There are approximately 248 properties to be rewired within this contract encompassing the following areas:
| Town | Streets |
|---|---|
| Alloa | Achray Court, Arran Court, Broad Street, Charles Street, Churchill Street, Crown Gardens, Gavins Road, Gean Road, Greenfield Street, High Street, Kingswell Park, Lewis Court, Lornshill Crescent, Medwyn Place, Mill Street, Turret Court and Windsor Gardens |
| Cambus | South Steet |
| Clackmannan | South Pilmuir Road andTower Place |
| Sauchie | Posthill |
| Tullibody | Alloa Road and Newbiggin Crescent |
The work entails the replacement of the entire house electrical wiring system.
This will include replacement of the fuse box with a new fuse-board containing fuses that can be easily reset, miniature circuit breakers, sensitive fault detection switch which can prevent injury from electric shock and make the electrical system safer.
The number of wall sockets will be increased to cope with modern needs and hard wired smoke and carbon monoxide detectors are installed providing a safer, reliable warning system that is not reliant on batteries.
Publications & Documents
See also
Page & Site Tools
Contact information
For further information about this page please contact:
Asset Project Management Team Leader, Facilities Management
Kilncraigs, Greenside Street, Alloa, FK10 1EB
Tel: 01259 450000
Email: hipt@clacks.gov.uk
Or use the on-line contact form